Challenging projects
After reconstruction the capacity of the Southern Waterworks will be 900,000 cubic meters per day, this will enable provision of reliable water supply for new developments in the southern part of St. Petersburg. An important stage of the Southern Waterworks rehabilitation is the construction of the drinking water treatment block K-6.
The capacity of the new block is 350,000 m ³/d. The block will be put into operation at the end of 2009, thus connecting the new developments of the South-Western coastal part of the city (including “The Baltic Pearl” Complex) and the industrial area of Shushary zone, to water networks.
With the above water treatment technology, the produced water will fully meet the existing hygienic standards.
The design of the Main Waterworks rehabilitation project including the construction of a new 500,000 m3/d treatment block was completed in 2008. The new block will allow to take the outdated facilities out of operation and ensure water supply to the raised areas of Vasilievsky Island and to “New Holland” area.
The reconstruction of the Northern Waterworks to reach the capacity of 700,000m3/d will guarantee water supply to new developments in the Northern coastal areas, settlements of Kamenka, Kolomyagi, Severnaya Dolina and a number of industrial zones.
The reconstruction of Kolpino Waterworks to reach the capacity of 250,000 m3/d will guarantee water supply to Kolpinsly and Pushkinsky districts.
Development of underground water resources "Molodezhnoe" and "Solnechnoe" will let Kurortny district use its own local water sources.
In 2008, the installation of two lines of the inverted siphon under the bottom of the Gulf of Finland continued. Both lines, 8 km each, will provide the town of Kronstadt with water taken from underground sources of Izhorskaya mound. After the completion of the works, the efficiency of Kronstadt water supply system will increase.
Besides, construction of new water pipelines in various districts of St. Petersburg (including construction of a separate water pipeline from the Main Waterworks to the raised territories of Vasilievsky Island and CHP-7) is planned. |